Home Repairs On Video

Added: Jul 6, 2011

From: minimansions

Duration: 4:37

I have to install the mouldings on the end panels and we are ready to stain. I have the doors for the upper cabinets and the drawer fronts to distress and they will be ready as well. Tomorrow we will prime the sink , counter top and backsplashes and get them ready to spray the iron. The crown moulding is installed. We will be taking this down to the showroom on monday. The next project for the showroom is an island fashioned after the cape cod window surround. The walnut counter top will have a rope moulding edge.

Channel: Howto

Tags: linkin  park  iron  walk  maiden  countertops  crown  moulding  cabinet  door  drawer  fronts  buffalo  farmhouse  sink  diy  project  installation  spray  metal  lacquer  stain  finishes  crafts  cabinets  showroom  display  design  interior  architect  mouldings  construction  repair  iron maiden  inc  kitchen  water  cleaning  commercial  building  removal 


Rating: 5.0' max='5' min='1' numRaters='1' rel='http://schemas.google.com/g/2005#overall ( ratings)    Views: 1194    Comments: 0